Source-linked public information on costs, timelines and status

Explore public project information from announcement to delivery.

GTrack.in organizes publicly announced central and state government projects into a searchable reference with timelines, costs, current status and source links in one place.

Coverage snapshot
Current public records in the tracker
Live
100
Projects
75
Delayed / late
13
On track
₹45,28,460 cr
Tracked cost
31
Sectors
31
State tags
Project finder

Find projects by state, sector or schedule.

Use the state-wise filter for quick local research, then open a project page for timeline, cost, status notes and source links.

100 source-linked records indexed
Showing
100
matching records
Delayed / late
75
against first target
On track
13
current target aligned
Tracked cost
₹45,28,460 cr
within current view
Popular sectors
State quick filters
100 projects shownOpen any project for full details
CentralLow risk
Regional Rail

Delhi-Ghaziabad-Meerut RRTS / Namo Bharat Corridor

An 82.15 km regional rapid rail corridor connecting Delhi, Ghaziabad and Meerut with semi-high-speed Namo Bharat services. Latest official/news reports say the full corridor was dedicated to the nation on 22 Feb 2026 alongside Meerut Metro services.

Completed LateCompleted
Cost
₹30,274 cr
First target
Jun 2025
State
Delhi, Uttar Pradesh
Verified
2 May 2026
View project page
StateLow risk
Roads & Highways

Ganga Expressway

A 594 km access-controlled greenfield expressway from Meerut to Prayagraj. Latest news reports say Prime Minister Narendra Modi inaugurated the corridor on 29 Apr 2026, cutting travel time to roughly six hours and opening the route for public use.

Completed LateCompleted
Cost
₹36,230 cr
First target
Dec 2024
State
Uttar Pradesh
Verified
2 May 2026
View project page
CentralMedium risk
Digital Infrastructure

4G Mobile Services Saturation Project for Uncovered Villages

A national telecom connectivity programme to provide 4G mobile services to uncovered villages using public funding and BSNL-led rollout.

DelayedUnder Construction
Cost
₹26,316 cr
First target
Dec 2024
State
Pan-India Rural
Verified
1 May 2026
View project page
CentralMedium risk
Urban Water & Sewerage

AMRUT 2.0

A national urban mission focused on universal water supply, sewerage/septage management, water-body rejuvenation and water-secure cities.

To Be AssessedUnder Construction
Cost
₹2,77,000 cr
First target
Mar 2026
State
Pan-India Urban
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Agra Metro Rail Project

A two-corridor metro system for Agra serving tourism, heritage and urban transport nodes including Taj East Gate, Agra Fort and Sikandra.

DelayedPartly Operational
Cost
₹8,379 cr
First target
Dec 2024
State
Uttar Pradesh
Verified
1 May 2026
View project page
State / JVLow risk
Urban Metro

Ahmedabad Metro Rail Project Phase 1

A metro network for Ahmedabad with east-west and north-south corridors delivered under Gujarat Metro Rail Corporation.

Completed LateCompleted
Cost
₹10,773 cr
First target
Dec 2020
State
Gujarat
Verified
1 May 2026
View project page
StateHigh risk
Urban Development

Amaravati Capital City Development

A planned capital city and trunk infrastructure programme for Andhra Pradesh, revived with renewed state and multilateral support.

DelayedUnder Construction
Cost
₹51,000 cr
First target
Dec 2019
State
Andhra Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Railway Stations

Amrit Bharat Station Scheme

A national station redevelopment and upgradation programme covering more than 1,300 railway stations through long-term station master planning.

To Be AssessedUnder Construction
Cost
₹24,470 cr
First target
Dec 2026
State
Pan-India
Verified
1 May 2026
View project page
CentralLow risk
Road Tunnel

Atal Tunnel, Rohtang

A 9.02 km all-weather highway tunnel below Rohtang Pass, reducing the Manali-Leh route and improving strategic connectivity to Lahaul-Spiti and Ladakh.

Completed LateCompleted
Cost
₹3,200 cr
First target
Dec 2016
State
Himachal Pradesh
Verified
1 May 2026
View project page
State / JVHigh risk
Urban Metro

Bengaluru Metro Phase 2

A large expansion of Namma Metro including extensions and new lines such as Yellow, Pink and other Phase 2 corridors.

DelayedUnder Construction
Cost
₹26,405 cr
First target
Dec 2020
State
Karnataka
Verified
1 May 2026
View project page
State / JVHigh risk
Urban Metro

Bengaluru Metro Phase 2A and 2B: ORR-Airport Line

A major metro expansion from Central Silk Board to KR Puram and onward to Kempegowda International Airport, serving one of Bengaluru’s most congested corridors.

DelayedUnder Construction
Cost
₹14,788 cr
First target
Dec 2025
State
Karnataka
Verified
1 May 2026
View project page
State / JVHigh risk
Suburban Rail

Bengaluru Suburban Rail Project

A 148.17 km suburban rail network for Bengaluru, divided into four corridors and largely aligned with existing railway corridors to improve commuter mobility.

On TrackUnder Construction
Cost
₹14,615 cr
First target
Dec 2026
State
Karnataka
Verified
1 May 2026
View project page
CentralMedium risk
Expressway

Bengaluru-Chennai Expressway

A greenfield access-controlled expressway intended to reduce travel time between Bengaluru and Chennai through Karnataka, Andhra Pradesh and Tamil Nadu.

DelayedUnder Construction
Cost
₹17,000 cr
First target
Mar 2024
State
Karnataka, Andhra Pradesh, Tamil Nadu
Verified
1 May 2026
View project page
CentralHigh risk
Digital Infrastructure

BharatNet

A national rural broadband programme to connect gram panchayats and villages through optical fibre and related digital infrastructure.

DelayedUnder Construction
Cost
₹1,39,579 cr
First target
Dec 2016
State
Pan-India
Verified
1 May 2026
View project page
CentralHigh risk
Roads & Highways

Bharatmala Pariyojana Phase I

A national highway development programme covering economic corridors, feeder routes, inter-corridors, border roads, coastal roads, expressways and port connectivity.

DelayedUnder Construction
Cost
₹5,35,000 cr
First target
Dec 2021
State
Pan-India
Verified
1 May 2026
View project page
StateMedium risk
Airport

Bhogapuram International Airport

A greenfield international airport near Visakhapatnam intended to serve North Andhra and support coastal industrial and tourism growth.

On TrackUnder Construction
Cost
₹4,592 cr
First target
Dec 2026
State
Andhra Pradesh
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Bhopal Metro Rail Project

A metro rail network for Bhopal with priority corridors under construction and trial operations conducted on initial stretches.

DelayedUnder Construction
Cost
₹6,941 cr
First target
Dec 2024
State
Madhya Pradesh
Verified
1 May 2026
View project page
CentralLow risk
Roads & Bridges

Bogibeel Rail-cum-Road Bridge

A 4.94 km rail-cum-road bridge across the Brahmaputra linking Dibrugarh and Dhemaji, improving North Bank connectivity.

Completed LateCompleted
Cost
₹5,900 cr
First target
Dec 2009
State
Assam
Verified
1 May 2026
View project page
StateLow risk
Expressway

Bundelkhand Expressway

A 296 km expressway connecting Chitrakoot with the Agra-Lucknow Expressway near Etawah, supporting Bundelkhand connectivity.

Completed LateCompleted
Cost
₹14,850 cr
First target
Feb 2022
State
Uttar Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Public Buildings

Central Vista Redevelopment Project

Redevelopment of India’s Central Vista including the new Parliament building, Kartavya Path, common central secretariat buildings and related public infrastructure.

DelayedPartly Operational
Cost
₹13,450 cr
First target
Dec 2024
State
Delhi
Verified
1 May 2026
View project page
CentralHigh risk
Roads & Highways

Char Dham Mahamarg Vikas Pariyojana

A strategic highway improvement programme to provide better all-weather road connectivity to Yamunotri, Gangotri, Kedarnath and Badrinath.

DelayedUnder Construction
Cost
₹12,000 cr
First target
Dec 2020
State
Uttarakhand
Verified
1 May 2026
View project page
CentralLow risk
Road Tunnel

Chenani-Nashri Tunnel / Dr Syama Prasad Mookerjee Tunnel

A 9.2 km highway tunnel on NH-44 bypassing snow and landslide-prone sections between Chenani and Nashri.

Completed LateCompleted
Cost
₹3,720 cr
First target
May 2016
State
Jammu & Kashmir
Verified
1 May 2026
View project page
State / JVHigh risk
Urban Metro

Chennai Metro Rail Phase II

A 118.9 km expansion of Chennai Metro with 128 stations across three corridors: Madhavaram-SIPCOT, Lighthouse-Poonamallee Bypass and Madhavaram-Sholinganallur.

DelayedUnder Construction
Cost
₹63,246 cr
First target
Dec 2026
State
Tamil Nadu
Verified
1 May 2026
View project page
StateMedium risk
Roads & Highways

Chennai Peripheral Ring Road

A peripheral corridor linking Ennore/Kattupalli port areas, national highways and industrial suburbs to reduce freight pressure inside Chennai.

DelayedUnder Construction
Cost
₹12,301 cr
First target
Dec 2024
State
Tamil Nadu
Verified
1 May 2026
View project page
CentralLow risk
Expressway

Delhi-Meerut Expressway

A high-speed expressway and NH-24 widening programme reducing Delhi-Meerut travel time and improving NCR connectivity.

Completed LateCompleted
Cost
₹8,346 cr
First target
Dec 2018
State
Delhi, Uttar Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Roads & Highways

Delhi-Mumbai Expressway

A 1,386 km access-controlled greenfield expressway planned to cut Delhi-Mumbai road travel time and create a high-speed freight and passenger spine across western and central India.

DelayedPartly Operational
Cost
₹98,000 cr
First target
Jan 2023
State
Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat, Maharashtra
Verified
1 May 2026
View project page
CentralLow risk
Roads & Bridges

Dhola-Sadiya Bridge / Bhupen Hazarika Setu

India’s longest river bridge at opening, connecting Dhola and Sadiya across the Lohit river and improving access to Arunachal Pradesh.

Completed LateCompleted
Cost
₹2,056 cr
First target
Dec 2015
State
Assam, Arunachal Pradesh
Verified
1 May 2026
View project page
State / JVMedium risk
Airport

Dholera International Airport

A greenfield airport being developed to serve Dholera Special Investment Region and its industrial/logistics ecosystem.

DelayedUnder Construction
Cost
₹1,305 cr
First target
Dec 2025
State
Gujarat
Verified
1 May 2026
View project page
State / JVMedium risk
Industrial Infrastructure

Dholera Special Investment Region and Industrial Smart City

A flagship Delhi-Mumbai Industrial Corridor node planned as a greenfield industrial smart city with trunk infrastructure, industrial land and urban services.

DelayedUnder Construction
Cost
₹3,000 cr
First target
Dec 2025
State
Gujarat
Verified
1 May 2026
View project page
CentralHigh risk
Hydropower

Dibang Multipurpose Project

A planned 2,880 MW multipurpose hydropower and flood moderation project on the Dibang River, among India’s largest hydro projects.

On TrackUnder Construction
Cost
₹31,876 cr
First target
Mar 2032
State
Arunachal Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Roads & Highways

Dwarka Expressway / NH-248BB

A controlled-access urban expressway linking Dwarka in Delhi with Gurugram and NH-48, including elevated and tunnel sections.

DelayedPartly Operational
Cost
₹9,000 cr
First target
Dec 2021
State
Delhi, Haryana
Verified
1 May 2026
View project page
CentralLow risk
Freight Rail

Eastern Dedicated Freight Corridor

A dedicated freight railway corridor built to shift heavy freight away from saturated passenger railway lines and improve logistics reliability.

Completed LateCompleted
Cost
₹51,000 cr
First target
Dec 2017
State
Punjab, Haryana, Uttar Pradesh, Bihar, Jharkhand, West Bengal
Verified
1 May 2026
View project page
CentralHigh risk
Ports & Logistics

Galathea Bay International Container Transshipment Port

A proposed deep-draft international container transshipment port at Galathea Bay, intended to reduce dependence on foreign transshipment hubs.

To Be AssessedAnnounced
Cost
₹41,000 cr
First target
Dec 2028
State
Andaman & Nicobar Islands
Verified
1 May 2026
View project page
CentralMedium risk
Power Transmission

Green Energy Corridor Phase II

A transmission programme supporting evacuation and integration of renewable energy through intra-state lines and substations across multiple states.

To Be AssessedUnder Construction
Cost
₹12,031 cr
First target
Mar 2026
State
Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu, Uttar Pradesh
Verified
1 May 2026
View project page
State / JVLow risk
Urban Metro

Hyderabad Metro Rail Project

One of India’s largest PPP metro systems, built across three elevated corridors in Hyderabad.

Completed LateCompleted
Cost
₹18,114 cr
First target
Dec 2017
State
Telangana
Verified
1 May 2026
View project page
StateHigh risk
Industrial Infrastructure

Hyderabad Pharma City

A proposed large pharmaceutical manufacturing cluster near Hyderabad with common infrastructure, utilities and environmental facilities.

DelayedAnnounced
Cost
₹64,000 cr
First target
Dec 2020
State
Telangana
Verified
1 May 2026
View project page
State / JVHigh risk
Roads & Highways

Hyderabad Regional Ring Road - Northern Section

A regional expressway/ring road section intended to connect national highways around Hyderabad and support logistics and satellite urban growth.

DelayedTendering
Cost
₹9,500 cr
First target
Dec 2025
State
Telangana
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Indore Metro Rail Project

A metro network for Indore with an initial super-priority section under trial and wider corridor works continuing.

DelayedUnder Construction
Cost
₹7,500 cr
First target
Dec 2024
State
Madhya Pradesh
Verified
1 May 2026
View project page
State / JVMedium risk
Multimodal Logistics

Integrated Multi-Modal Logistics Hub, Nangal Chaudhary

A major logistics hub in southern Haryana planned near industrial corridor and freight rail/highway networks for warehousing and cargo aggregation.

To Be AssessedUnder Construction
Cost
₹3,886 cr
First target
Dec 2025
State
Haryana
Verified
1 May 2026
View project page
CentralMedium risk
Water Supply

Jal Jeevan Mission

A national rural drinking-water mission to provide functional household tap connections and improve water service delivery across villages.

DelayedUnder Construction
Cost
₹3,60,000 cr
First target
Dec 2024
State
Pan-India
Verified
1 May 2026
View project page
CentralMedium risk
Inland Waterways

Jal Marg Vikas Project on National Waterway-1

A programme to develop commercial navigation infrastructure on National Waterway-1 including fairway, terminals, navigation aids and multimodal logistics facilities.

DelayedPartly Operational
Cost
₹5,369 cr
First target
Dec 2023
State
Uttar Pradesh, Bihar, Jharkhand, West Bengal
Verified
1 May 2026
View project page
StateHigh risk
Water Resources

Kaleshwaram Lift Irrigation Project

A mega lift-irrigation system on the Godavari basin involving barrages, pump houses, reservoirs and canal networks.

DelayedPartly Operational
Cost
₹1,00,000 cr
First target
Dec 2019
State
Telangana
Verified
1 May 2026
View project page
State / JVLow risk
Airport

Kannur International Airport

A greenfield international airport serving Kannur and the Malabar region of Kerala.

Completed LateCompleted
Cost
₹2,292 cr
First target
Dec 2015
State
Kerala
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Kanpur Metro Rail Project

A two-corridor metro project for Kanpur’s dense urban and industrial areas, with priority sections operational and balance sections under construction.

DelayedPartly Operational
Cost
₹11,076 cr
First target
Dec 2024
State
Uttar Pradesh
Verified
1 May 2026
View project page
CentralHigh risk
Water Resources

Ken-Betwa River Linking National Project

The first major project under India’s river interlinking programme, designed to transfer water from the Ken basin to the Betwa basin through Daudhan Dam and a link canal, with irrigation, drinking-water, hydropower and solar components.

On TrackUnder Construction
Cost
₹44,605 cr
First target
Dec 2029
State
Madhya Pradesh, Uttar Pradesh
Verified
1 May 2026
View project page
State / JVMedium risk
Renewable Energy

Khavda Renewable Energy Park

A very large renewable energy park in Kutch combining solar and wind resources with phased generation and transmission infrastructure.

On TrackUnder Construction
Cost
₹1,50,000 cr
First target
Dec 2030
State
Gujarat
Verified
1 May 2026
View project page
State / JVLow risk
Urban Metro

Kochi Metro Rail Phase 1

Kochi’s elevated metro corridor, delivered in stages and integrated with water metro and bus networks.

Completed LateCompleted
Cost
₹7,470 cr
First target
Dec 2016
State
Kerala
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Transit

Kochi Water Metro

An integrated electric ferry network connecting Kochi’s islands with metro and bus systems using modern terminals and battery-powered vessels.

DelayedPartly Operational
Cost
₹1,137 cr
First target
Dec 2020
State
Kerala
Verified
1 May 2026
View project page
CentralMedium risk
Urban Metro

Kolkata East-West Metro Corridor

A metro corridor connecting Salt Lake, Sealdah, Esplanade and Howrah, including India’s first underwater metro tunnel beneath the Hooghly River.

DelayedPartly Operational
Cost
₹8,575 cr
First target
Dec 2015
State
West Bengal
Verified
1 May 2026
View project page
State / JVMedium risk
Industrial Infrastructure

Krishnapatnam Industrial Node

A Chennai-Bengaluru Industrial Corridor node near Krishnapatnam port, planned with trunk infrastructure and multimodal logistics access.

To Be AssessedUnder Construction
Cost
₹2,139 cr
First target
Dec 2025
State
Andhra Pradesh
Verified
1 May 2026
View project page
State / JVLow risk
Urban Metro

Lucknow Metro Phase 1A

The first phase of Lucknow Metro, a north-south urban metro corridor linking the airport side to Munshipulia.

Completed On TimeCompleted
Cost
₹6,880 cr
First target
Mar 2019
State
Uttar Pradesh
Verified
1 May 2026
View project page
StateMedium risk
Multimodal Logistics

MIHAN: Multi-modal International Cargo Hub and Airport at Nagpur

An airport-linked cargo, logistics and industrial hub at Nagpur, positioned at India’s geographic centre for multimodal freight and SEZ development.

To Be AssessedPartly Operational
Cost
₹2,581 cr
First target
Dec 2025
State
Maharashtra
Verified
1 May 2026
View project page
StateMedium risk
Ports & Logistics

Machilipatnam Port

A long-pending greenfield port at Machilipatnam intended to support coastal cargo and regional industrial development.

To Be AssessedUnder Construction
Cost
₹5,156 cr
First target
Dec 2026
State
Andhra Pradesh
Verified
1 May 2026
View project page
StateMedium risk
Expressway

Maharashtra Samruddhi Mahamarg

A 701 km access-controlled expressway connecting Nagpur and the Mumbai region, intended to reduce travel time and unlock logistics and industrial corridors.

DelayedPartly Operational
Cost
₹55,335 cr
First target
Dec 2021
State
Maharashtra
Verified
1 May 2026
View project page
State / JVLow risk
Airport

Manohar International Airport, Mopa

A greenfield airport at Mopa developed under PPP to complement Dabolim and expand Goa’s aviation capacity.

Completed LateCompleted
Cost
₹2,870 cr
First target
Dec 2020
State
Goa
Verified
1 May 2026
View project page
CentralMedium risk
Multimodal Logistics

Multi Modal Logistics Park, Jogighopa

A PM Gati Shakti-aligned logistics park at Jogighopa designed to integrate road, rail, inland waterway and regional freight movement in the North East.

DelayedUnder Construction
Cost
₹693 cr
First target
Dec 2023
State
Assam
Verified
1 May 2026
View project page
CentralMedium risk
Multimodal Logistics

Multi Modal Logistics Park, Mappedu near Chennai

A national MMLP near Chennai planned with highway, rail and port connectivity for the Chennai-Bengaluru industrial and logistics region.

To Be AssessedUnder Construction
Cost
₹1,424 cr
First target
Dec 2025
State
Tamil Nadu
Verified
1 May 2026
View project page
StateMedium risk
Urban Roads

Mumbai Coastal Road Project, South Section

A coastal urban road from Marine Drive to Worli with tunnels, interchanges and reclaimed-road sections to reduce travel time along south Mumbai’s western seafront.

DelayedPartly Operational
Cost
₹13,984 cr
First target
Dec 2022
State
Maharashtra
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Mumbai Metro Line 3 / Aqua Line

A 33.5 km fully underground metro corridor from Colaba to Bandra-Kurla Complex and SEEPZ, also known as the Aqua Line.

DelayedPartly Operational
Cost
₹37,276 cr
First target
Dec 2021
State
Maharashtra
Verified
1 May 2026
View project page
StateMedium risk
Urban Metro

Mumbai Metro Line 4: Wadala-Kasarvadavali

A 32.32 km fully elevated metro corridor with 30 stations from Wadala to Kasarvadavali, designed to connect with other Mumbai metro lines, monorail and suburban rail interfaces.

DelayedUnder Construction
Cost
₹14,549 cr
First target
Dec 2022
State
Maharashtra
Verified
1 May 2026
View project page
StateLow risk
Roads & Bridges

Mumbai Trans Harbour Link / Atal Setu

A 21.8 km six-lane sea bridge linking Mumbai and Navi Mumbai, including about 16.5 km sea bridge and 5.5 km land approaches, inaugurated as Atal Setu.

Completed LateCompleted
Cost
₹17,843 cr
First target
Sept 2022
State
Maharashtra
Verified
1 May 2026
View project page
CentralHigh risk
High Speed Rail

Mumbai-Ahmedabad High Speed Rail

India’s first bullet train corridor, about 508 km long, planned for high-speed passenger services between Mumbai and Ahmedabad with JICA-supported financing and NHSRCL implementation.

DelayedUnder Construction
Cost
₹1,08,000 cr
First target
Dec 2023
State
Maharashtra, Gujarat, Dadra & Nagar Haveli and Daman & Diu
Verified
1 May 2026
View project page
StateMedium risk
Roads & Highways

Mumbai-Pune Expressway Missing Link Project

A tunnel-and-viaduct bypass of the Khandala ghat section to shorten and improve the Mumbai-Pune Expressway alignment.

DelayedUnder Construction
Cost
₹6,695 cr
First target
Dec 2023
State
Maharashtra
Verified
1 May 2026
View project page
State / JVLow risk
Urban Metro

Nagpur Metro Rail Project Phase 1

A two-corridor metro network in Nagpur implemented by Maha Metro, with Phase 1 fully inaugurated in 2022.

Completed LateCompleted
Cost
₹8,680 cr
First target
Dec 2020
State
Maharashtra
Verified
1 May 2026
View project page
CentralMedium risk
Clean Energy

National Green Hydrogen Mission

A national mission to support green hydrogen production, electrolyser manufacturing, pilot projects, research, standards and enabling policy frameworks.

On TrackUnder Construction
Cost
₹19,744 cr
First target
Dec 2030
State
Pan-India
Verified
1 May 2026
View project page
State / JVMedium risk
Airport

Navi Mumbai International Airport

A second major airport for the Mumbai Metropolitan Region intended to decongest Mumbai airport and support long-term passenger and cargo demand.

DelayedUnder Construction
Cost
₹16,700 cr
First target
Dec 2020
State
Maharashtra
Verified
1 May 2026
View project page
State / JVMedium risk
Airport

Noida International Airport, Jewar Phase 1

A greenfield international airport at Jewar planned as a major NCR aviation and cargo hub with phased terminal and runway expansion.

DelayedUnder Construction
Cost
₹10,056 cr
First target
Dec 2024
State
Uttar Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Energy

Numaligarh Refinery Expansion Project

Expansion of Numaligarh Refinery from 3 MMTPA to 9 MMTPA, including a crude oil import terminal at Paradip and long-distance crude pipeline.

DelayedUnder Construction
Cost
₹28,026 cr
First target
Dec 2024
State
Assam, Odisha
Verified
1 May 2026
View project page
CentralMedium risk
Industrial Infrastructure

PM MITRA Textile Parks Scheme

A central scheme to develop seven Mega Integrated Textile Region and Apparel parks with integrated textile value-chain infrastructure and state SPVs.

On TrackUnder Construction
Cost
₹4,445 cr
First target
Mar 2028
State
Tamil Nadu, Telangana, Gujarat, Karnataka, Madhya Pradesh, Uttar Pradesh, Maharashtra
Verified
1 May 2026
View project page
CentralHigh risk
Hydropower

Pakal Dul Hydroelectric Project

A major storage hydropower project in Kishtwar district forming part of the Chenab Valley power development programme.

DelayedUnder Construction
Cost
₹8,112 cr
First target
Dec 2023
State
Jammu & Kashmir
Verified
1 May 2026
View project page
State / JVMedium risk
Industrial Infrastructure

Palakkad Integrated Manufacturing Cluster

A newly approved integrated manufacturing cluster under the Kochi-Bengaluru Industrial Corridor and national industrial corridor programme.

On TrackAnnounced
Cost
₹3,806 cr
First target
Dec 2029
State
Kerala
Verified
1 May 2026
View project page
StateHigh risk
Airport

Parandur Greenfield Airport, Chennai

A proposed second airport for the Chennai metropolitan region at Parandur, intended to handle long-term passenger and cargo growth.

To Be AssessedAnnounced
Cost
₹20,000 cr
First target
Dec 2028
State
Tamil Nadu
Verified
1 May 2026
View project page
State / JVMedium risk
Thermal Power

Patratu Super Thermal Power Project Phase 1

A 2,400 MW first phase of a planned 4,000 MW super thermal power project at Patratu, developed as an NTPC-state joint venture.

DelayedUnder Construction
Cost
₹18,668 cr
First target
Dec 2022
State
Jharkhand
Verified
1 May 2026
View project page
State / JVHigh risk
Water Resources

Polavaram Irrigation Project

A large multipurpose Godavari river project intended to provide irrigation, drinking water, hydropower and inter-basin water transfer benefits.

DelayedUnder Construction
Cost
₹55,548 cr
First target
Dec 2018
State
Andhra Pradesh
Verified
1 May 2026
View project page
CentralMedium risk
Housing

Pradhan Mantri Awas Yojana - Gramin

A rural housing programme to provide financial assistance for pucca houses to eligible households, replacing the earlier Indira Awaas Yojana framework.

DelayedUnder Construction
Cost
₹3,06,000 cr
First target
Mar 2022
State
Pan-India Rural
Verified
1 May 2026
View project page
CentralMedium risk
Housing

Pradhan Mantri Awas Yojana - Urban

A national urban affordable housing mission supporting beneficiary-led construction, affordable housing partnerships, in-situ slum redevelopment and credit-linked subsidy components.

DelayedUnder Construction
Cost
₹2,00,000 cr
First target
Mar 2022
State
Pan-India Urban
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Pune Metro Rail Project Phase 1

A two-corridor metro project serving PCMC-Swargate and Vanaz-Ramwadi corridors as a mass rapid transit backbone for Pune.

DelayedPartly Operational
Cost
₹11,420 cr
First target
Dec 2021
State
Maharashtra
Verified
1 May 2026
View project page
StateHigh risk
Roads & Highways

Pune Ring Road

A large greenfield ring road planned around the Pune Metropolitan Region to decongest the city and connect industrial/logistics corridors.

DelayedUnder Construction
Cost
₹42,711 cr
First target
Dec 2026
State
Maharashtra
Verified
1 May 2026
View project page
StateLow risk
Expressway

Purvanchal Expressway

A 340 km access-controlled expressway connecting Lucknow with eastern Uttar Pradesh up to Ghazipur.

Completed LateCompleted
Cost
₹22,494 cr
First target
Apr 2021
State
Uttar Pradesh
Verified
1 May 2026
View project page
State / JVHigh risk
Energy

Rajasthan Refinery and Petrochemical Complex, Barmer

A 9 MMTPA refinery integrated with petrochemical units at Pachpadra, Barmer, developed by HPCL Rajasthan Refinery Ltd.

DelayedUnder Construction
Cost
₹72,937 cr
First target
Dec 2022
State
Rajasthan
Verified
1 May 2026
View project page
StateMedium risk
Ports & Logistics

Ramayapatnam Port

A greenfield non-major port being developed on Andhra Pradesh’s coast with phased berths and cargo capacity.

DelayedUnder Construction
Cost
₹3,736 cr
First target
Jul 2025
State
Andhra Pradesh
Verified
1 May 2026
View project page
CentralHigh risk
Railways

Rishikesh-Karnaprayag New Rail Line

A strategic 125 km Himalayan rail line from Rishikesh to Karnaprayag, with extensive tunnelling, planned to improve all-weather rail access into Garhwal.

DelayedUnder Construction
Cost
₹16,200 cr
First target
Dec 2024
State
Uttarakhand
Verified
1 May 2026
View project page
CentralMedium risk
Ports & Logistics

Sagarmala Programme

A national port-led development programme covering port modernization, connectivity, coastal economic zones and coastal community development.

To Be AssessedUnder Construction
Cost
₹5,40,000 cr
First target
Dec 2035
State
Coastal India
Verified
1 May 2026
View project page
State / JVLow risk
Water Resources

Sardar Sarovar Project

A major multipurpose Narmada river project with dam, canal, irrigation, drinking water and hydropower components.

Completed LateCompleted
Cost
₹65,000 cr
First target
Dec 2000
State
Gujarat, Madhya Pradesh, Maharashtra, Rajasthan
Verified
1 May 2026
View project page
CentralLow risk
Road Tunnel

Sela Tunnel Project

A strategic tunnel system on the Balipara-Charduar-Tawang road that improves all-weather access to Tawang and reduces snowbound pass exposure.

Completed LateCompleted
Cost
₹825 cr
First target
Dec 2022
State
Arunachal Pradesh
Verified
1 May 2026
View project page
CentralHigh risk
Railways

Sivok-Rangpo New Rail Line

A tunnel-heavy rail link from Sivok in West Bengal to Rangpo in Sikkim, intended to connect Sikkim to the national rail network.

DelayedUnder Construction
Cost
₹12,000 cr
First target
Dec 2023
State
West Bengal, Sikkim
Verified
1 May 2026
View project page
StateLow risk
Public Buildings

Statue of Unity and Kevadia Tourism Infrastructure

A 182-metre statue of Sardar Vallabhbhai Patel and associated tourism/public infrastructure near the Sardar Sarovar Dam.

Completed On TimeCompleted
Cost
₹2,989 cr
First target
Oct 2018
State
Gujarat
Verified
1 May 2026
View project page
CentralHigh risk
Hydropower

Subansiri Lower Hydroelectric Project

A 2,000 MW hydropower project on the Subansiri River, delayed for years by protests and technical/environmental review issues.

DelayedUnder Construction
Cost
₹21,247 cr
First target
Dec 2012
State
Arunachal Pradesh, Assam
Verified
1 May 2026
View project page
State / JVMedium risk
Urban Metro

Surat Metro Rail Project Phase 1

A two-corridor metro system for Surat linking Sarthana-Dream City and Bhesan-Saroli to improve urban mobility in a fast-growing city.

DelayedUnder Construction
Cost
₹12,020 cr
First target
Dec 2025
State
Gujarat
Verified
1 May 2026
View project page
CentralMedium risk
Roads & Highways

Surat-Chennai Economic Corridor

A major road economic corridor planned to improve freight movement and reduce travel time between industrial regions in western and southern India.

DelayedUnder Construction
Cost
₹50,000 cr
First target
Dec 2025
State
Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, Tamil Nadu
Verified
1 May 2026
View project page
CentralLow risk
Expressway

Trans-Haryana Expressway / Ambala-Narnaul Expressway

A high-speed corridor across Haryana connecting Ambala to Narnaul and improving east-west freight movement.

Completed LateCompleted
Cost
₹9,000 cr
First target
Mar 2022
State
Haryana
Verified
1 May 2026
View project page
CentralHigh risk
Power Transmission

Transmission System for Evacuation of 13 GW Renewable Energy from Ladakh

A high-capacity transmission corridor to evacuate 13 GW of renewable energy from Ladakh to the national grid through challenging high-altitude terrain.

On TrackUnder Construction
Cost
₹20,774 cr
First target
Mar 2030
State
Ladakh, Himachal Pradesh, Haryana
Verified
1 May 2026
View project page
State / JVMedium risk
Industrial Infrastructure

Tumakuru Industrial Node

An industrial node under the Chennai-Bengaluru Industrial Corridor/NICDC framework, planned with trunk infrastructure and logistics access near Bengaluru.

To Be AssessedUnder Construction
Cost
₹1,702 cr
First target
Dec 2026
State
Karnataka
Verified
1 May 2026
View project page
CentralLow risk
Railways

Udhampur-Srinagar-Baramulla Rail Link

A strategic Himalayan railway link connecting the Kashmir Valley to the national rail network through major tunnels and bridges including the Chenab bridge.

Completed LateCompleted
Cost
₹41,000 cr
First target
Aug 2007
State
Jammu & Kashmir
Verified
1 May 2026
View project page
State / JVHigh risk
Ports & Logistics

Vadhavan Port

A proposed all-weather deep-draft major port at Vadhavan designed to handle ultra-large container vessels and expand India’s west-coast container capacity.

On TrackAnnounced
Cost
₹76,220 cr
First target
Dec 2029
State
Maharashtra
Verified
1 May 2026
View project page
StateHigh risk
Roads & Bridges

Versova-Bandra Sea Link

A planned coastal bridge link extending the Bandra-Worli Sea Link northward toward Versova as part of Mumbai’s western coastal road network.

DelayedUnder Construction
Cost
₹11,333 cr
First target
Dec 2023
State
Maharashtra
Verified
1 May 2026
View project page
State / JVMedium risk
Ports & Logistics

Vizhinjam International Seaport Phase 1

A deep-water international container transshipment port near Thiruvananthapuram designed to capture India-bound transshipment traffic currently routed via foreign hubs.

DelayedPartly Operational
Cost
₹7,700 cr
First target
Dec 2019
State
Kerala
Verified
1 May 2026
View project page
CentralMedium risk
Freight Rail

Western Dedicated Freight Corridor

A high-capacity freight rail corridor linking the National Capital Region to western India’s ports and industrial regions.

DelayedPartly Operational
Cost
₹72,000 cr
First target
Dec 2017
State
Uttar Pradesh, Haryana, Rajasthan, Gujarat, Maharashtra
Verified
1 May 2026
View project page
StateMedium risk
Thermal Power

Yadadri Thermal Power Station

A 5x800 MW thermal power station at Damaracherla, developed by TSGENCO to add baseload capacity for Telangana.

DelayedUnder Construction
Cost
₹29,965 cr
First target
Dec 2020
State
Telangana
Verified
1 May 2026
View project page
CentralHigh risk
Road Tunnel

Zojila Tunnel Project

A strategic all-weather tunnel and approach road project on NH-1 near Zojila Pass to connect Kashmir Valley and Ladakh through difficult Himalayan terrain.

On TrackUnder Construction
Cost
₹6,810 cr
First target
Sept 2026
State
Jammu & Kashmir, Ladakh
Verified
1 May 2026
View project page
Methodology

Source-linked public information, organized for research.

The tracker maps publicly available information into a structured project view: what was announced, what target was first given, what recent sources say, and what timeline status is currently visible.

First-target comparison

Projects include the first announced completion target and the latest current target where these are available in public sources.

AI-assisted data mapping

AI automation helps extract, classify and map public project information into fields like cost, timeline, status, sector and state. This can introduce errors, so source links are provided for review and correction.

Designed for scale

Structured records, milestones and source links keep the public tracker fast to browse as coverage grows across states and sectors.

Review-ready updates

New public information can be checked against existing records before it changes status, cost or timeline fields.

Approved source universe

Government portals, ministry pages, PIB, budget papers and official dashboards
Tender records, procurement portals, award notices and contractor/package documents
National and state-level news agencies, established newspapers and infrastructure desks
Infrastructure trackers, construction blogs and sector-specific project publications
Verified public posts from departments, ministers, chief ministers and elected representatives
CAG reports, parliamentary Q&A, assembly Q&A, court orders and clearance documents